Pages

Assistant Electro-Mechanical Engineer - Water Treatment Plant Construction Supervision

About the Project:
A new Water Treatment Plant will be constructed and equipped for Phase 1 (60,000 m3/d) flow and prepared
for the extension of Phase 2 capacity of 120,000 m3/d. Other elements of the project include the supervision of the construction of a Raw Water Intake, Pumping stations, Intermediate Control Tank and Centralized Technical Management System (SCADA). The project is for approximately 24 months and is located near Sabié in Mozambique. Anticipated start date is September 2014.
Candidate Profile:
Applicants should have a University Engineering degree 
Applicants must have:
  1. at least eight (8) years sound post-graduate experience  
  2. at least four (4) years experience in the supervision of installation and testing of M&E equipment including stations at WTPs
​The following would be an advantage: 
  • Experience in the Region, but in particular in Mozambique
  • Portuguese
This is a full time position for 16 months

Popular Posts